Platform 03 — Threerae

Environmental Rehabilitation and Erosion Control in South Africa

A specialised environmental-services platform built around hydroseeding — restoring disturbed land, stabilising vulnerable surfaces and establishing vegetation for mining, infrastructure and construction clients across all nine South African provinces.

The Platform

Rehabilitation That Reduces A Liability, Not Just A Line Item

Environmental Rehabilitation & Erosion Control is a strategic growth platform within Threerae. Our flagship capability is hydroseeding, supported by complementary land-rehabilitation, vegetation-establishment and erosion-control solutions. Together they restore disturbed land, stabilise vulnerable surfaces and establish vegetation that holds without ongoing intervention.

For mining, infrastructure and construction clients, rehabilitation is not a landscaping exercise — it is a financial provision and a compliance obligation with a number attached to it. Work done properly and progressively reduces that number. Work deferred or done cosmetically increases it, because eroding surfaces have to be reshaped, degraded growth medium has to be replaced, and failed revegetation has to be repeated.

Our environmental objective

To build a specialised environmental-services business capable of supporting mining, infrastructure, construction and land-restoration projects through efficient, scalable and environmentally responsible rehabilitation solutions — with hydroseeding at the centre of the offering.

How We Work

Our Rehabilitation Approach

Site Assessment→
Soil Preparation→
Seed Selection→
Hydroseeding→
Erosion Control→
Vegetation Establishment→
Monitoring & Maintenance
01

Site-Specific Specification

Soil, terrain, climate, rainfall window, erosion risk and project specification assessed before a mix is designed. No single generic seed blend applied everywhere.

02

Sequenced Correctly

Surfaces prepared before seeding. Seed placed on compacted or chemically hostile ground will not establish, regardless of how well the mix is specified.

03

Timed To The Rainfall

Applications planned around the rainfall window, because young seedlings need moisture and timing is the cheapest variable available to improve establishment rates.

04

Verifiable Records

Application rates and coverage recorded as applied, so the work can be checked against the rehabilitation plan you have to report on.

05

Partnership-Led Delivery

A partnership model giving access to specialist environmental, engineering and rehabilitation expertise where a project requires it.

06

Nine Provinces

Coverage across Gauteng, KwaZulu-Natal, Western Cape, Eastern Cape, Free State, Limpopo, Mpumalanga, North West and Northern Cape.

Who We Serve

Sectors & Applications

Sectors

  • Mining and natural resources — rehabilitation, closure and erosion control
  • Construction and infrastructure — civil contractors, developers, operators
  • Agriculture and land management — restoration and soil stabilisation
  • Government and public sector — infrastructure and land-restoration projects

Provinces Served

  • Gauteng
  • KwaZulu-Natal
  • Western Cape
  • Eastern Cape
  • Free State
  • Limpopo
  • Mpumalanga
  • North West
  • Northern Cape

Next Step

Talk To Threerae

Tell us the site, the disturbed area and the rehabilitation outcome you have to achieve. We assess the ground, specify the work in the right sequence and quote in writing. If the programme is racing a rainfall season, say so — timing is usually the difference between rehabilitation and remediation.

Compliance Notice

Threerae is a registered credit provider in terms of the National Credit Act 34 of 2005. All lending applications are subject to affordability assessment and credit bureau checks. We lend responsibly.

Send An Enquiry

No commitment. We just need enough to start the conversation.

By submitting you consent to Threerae contacting you. Data processed per POPIA.